Interlink specializes in the professional transportation of oversized and overweight cargo.
PROJECT OVERVIEW
“Conquering the 300-ton mega-project from China to Long Thanh”
Following the success of projects in Hong Kong, Lang Son, etc., Interlink is proud to have successfully transported a super-heavy industrial machinery and equipment shipment on an impressive scale, affirming its leading position in the project transportation industry.
- Type: Commercial import.
- Total weight: Over 300 tons (monolithic cargo, cannot be disassembled).
- Route: Imported from China to a factory in Long Thanh, Dong Nai.
- Characteristics: The cargo has exceptional dimensions and requires special operating technical specifications.



PROJECT CHALLENGES
Transporting oversized and overweight cargo is an extremely difficult task, requiring more rigorous preparation than any other type of cargo:
- Huge size and weight: With a total weight exceeding 300 tons, movement requires careful calculation of surface pressure and the load-bearing capacity of the transportation infrastructure.
- Cargo nature: The cargo is monolithic and cannot be broken down, requiring specialized heavy-duty transport vehicles and lifting equipment.
- Time pressure: The shipment directly serves the factory’s production operations, requiring a seamless and error-free customs clearance and transportation process.
INTERLINK’S SOLUTION
With over 20 years of practical experience, Interlink’s team of experts has implemented an optimal solution:
- Strategic consulting: Thorough research into cargo characteristics to create an optimal transportation plan, maximizing cost savings for the client.
- Specialized Logistics: Utilizing heavy-duty cranes for lifting and lowering, and mobilizing a specialized towing team for overnight transportation, ensuring minimal traffic disruption and timely delivery to the factory.
- Full-Service Package: Interlink directly handles all import customs procedures, simplifying the process and shortening clearance time for businesses.
Achieved Results
The project was successfully delivered, delivering significant economic benefits to all parties involved:
- Safety & On-Time Delivery: The shipment of over 300 tons arrived safely at the Long Thanh factory, exactly as scheduled.
- Optimized Resources: Smart transportation solutions help clients minimize risks and save costs compared to traditional transportation methods.
- Proof of Capability: The success of this project once again confirms that Interlink possesses the necessary equipment, accessories, and in-depth knowledge to handle even the most challenging cargo.
- Absolute confidence: Actual results are the strongest affirmation of the slogan: “No theory, only real results.”